TUBE SHOP 1.10.9 - GUIDES AND PRACTICE FILES

START HERE
Open Tube_Shop_1.10.9_Design_Tools_Illustrated_REVIEW.pdf for the 29-page
tool-by-tool guide. The matching .docx is editable in Word.
For the complete first-job workflow, open
Tube_Shop_1.10.9_Visual_Quick_Start_REVIEW.pdf.
Print Tube_Shop_Visual_Checklist.pdf and keep
Tube_Shop_Visual_Troubleshooting.pdf beside Fusion.

Extract this entire ZIP before following links between the PDFs.
If your PDF viewer blocks local links, open the named PDF manually.

PRACTICE MODELS
models/ contains 13 Fusion checkpoints, the STEP input and a synthetic
STL example. Open disposable copies and follow the relevant guide page.
Import DT_Synthetic_balls_MM.stl as millimetres. Enter tube exercise
dimensions with the in suffix. The earlier point tubes are hidden in
DT03 and DT04 so the named 3D practice frame is easier to inspect.
QS109_04 precedes the fixed-point setup: stage and apply the specified
fixed choices before moving the B1/B2 points.

Use a separate demonstration die library. Demo_die_values.json contains
illustrative values, not a measured calibration or library replacement.

REFERENCE AND PICTURES
reference/Detailed_workflow_reference_REVIEW.pdf retains the detailed
first-job procedure. Editable Word copies are included.
screenshots/ contains original and numbered design-guide images.
quick-start-screenshots/ contains the earlier workflow images.
All source screenshots are genuine Fusion viewport captures.

REVIEW EDITION
Read each page's verification and recovery notes. Some 1.10.9 operations
failed in the demonstration; successful host following and R4.5 radius
conversion are not demonstrated. Native dialog captures are missing.
The steep-angle tab specimen is rejected. Experimental ZX geometry was
not tested in TubePro or on a machine. Physical calibration, fit and
structural strength require their own checks.

exports/ contains the demonstrated output files. Check units, geometry,
tooling and receiving-software settings before manufacturing.
